August 6, 2026
The strange thing about a Davenport Ranch summer in 2026 is how little of it happens outside the neighborhood. Between the shopping center at the entrance, the preserve across the highway, and the country club at the back, a resident can spend an entire Saturday without touching a stoplight. That was already true a few years ago. What is new is that the stoplights themselves are disappearing, and the construction that removes them is quietly rearranging how the neighborhood uses its own doorstep.
This is a guide to that reshuffled summer. It assumes you already live here. It also assumes you have been sitting at the Westlake Drive signal for years wondering when the underpass would actually open, and that you have your own opinion about the Pennybacker overlook parking situation. What follows is the current state of both, plus a working map of where the neighborhood is spending July and August while the corridor around it is under a jackhammer.
The Loop 360 project is easier to understand once you separate it into pieces. The piece that matters most to Davenport Ranch is the one closest to home: the underpass at Westlake Drive and Cedar Street, just south of the Pennybacker Bridge. That work broke ground in 2022, and the first part of the Loop 360 project is on target for a mid-2026 completion, with new main lanes taking shape south of the Pennybacker Bridge. The $72.1 million project constructs an underpass so the Loop 360 main lanes pass under the cross streets at Westlake Drive and Cedar Street, and $14 million of that comes from the City of Austin, funded through the $720 million Mobility Bond authorized by voters in 2016.
The scale of that intersection is worth naming. Loop 360 carried an average daily traffic of 52,050 vehicles in 2020, with nearly 14,000 daily users on the Westlake Drive and Cedar Street corridor, and TxDOT has described Westlake Drive at Loop 360 as the most congested intersection along the entire route. If the mid-2026 window holds, the neighborhood loses its two worst signals right as the summer commute is at its lightest.
The next phase begins almost immediately after. The second Loop 360 project is set for Courtyard Drive and RM 2222 just north of the Pennybacker Bridge, with construction planned to start in 2026, which means the northbound approach to the bridge becomes the next work zone before the southbound one has fully cooled off. If funding for all planned Loop 360 projects comes through, the corridor is likely to see another decade of construction, with some overlap between projects. Plan accordingly if you use 2222 to get to Mopac.
The shopping center at the front of the neighborhood is doing more work than it used to. Davenport Village is a 129,000 square foot specialty retail and professional office development of ten one- and two-story buildings with three points of ingress and egress, which is a technical way of saying it is compact enough to walk end to end and porous enough to slip in and out of by side street when 360 is stacked up.
The mix rewards residents who plan around it rather than treating it as a one-stop. A few anchors, briefly:
None of these are new. What is new is the way residents are using them. With the Westlake Drive light in its final months of misery and the Courtyard phase looming, driving over the bridge for a weeknight dinner has a cost it did not have three years ago. The village has absorbed that cost by becoming the default rather than the fallback.
Across 360 from the neighborhood entrance, Wild Basin Wilderness Preserve is the other end of the five-minute radius. The preserve covers 227 acres of native Hill Country habitat in West Lake Hills, was founded in 1974 by seven women in an environmentalist group called Now or Never, and is owned and operated jointly by Travis County and St. Edward's University. The 227-acre preserve includes land donated by Davenport Ranch itself, which is a piece of neighborhood history worth remembering the next time you walk it.
Two summer operational details change how the preserve is used. First, hours. Summer hours are in effect: the preserve opens at 7 a.m. daily and visitors must exit before the gate closes at 8:30 p.m., which puts a genuine sunrise hike inside a normal Davenport Ranch commute window. Second, fees. On weekdays there is no entrance fee and no reservation is required; on weekends and federal holidays reservations are required and a nominal fee is charged. Day-use rates are $5 for adults, $3 for youth ages 6 to 17, free for children ages 1 to 5, and $15 for a group of four to six adults.
If you live within five minutes of the gate, weekdays are the leverage. Parking is small, gates close when the lot fills, and weekend reservations are competitive. Weekday sunrise is essentially unrestricted.
The trail choices are more varied than the standard "we hiked Wild Basin" description on most Austin blogs. The trails at Wild Basin total almost three miles: the Arroyo Vista loop at 0.6 miles includes a stop at the scenic Overlook, the Creek Loop at 1.5 miles adds creek crossings, the Ledge Trail at 0.8 miles follows a natural limestone outcrop, the Woodland Trail is steep and rocky with some of the largest Ashe juniper specimens along the trails, and the Yaupon Loop at nearly 2 miles is the longest, crossing Bee Creek along the preserve's southern border.
| Trail | Distance | Character |
|---|---|---|
| Arroyo Vista | 0.6 mi | Shortest loop, ends at the Overlook |
| Ledge Trail | 0.8 mi | Follows a natural limestone outcrop |
| Creek Loop | 1.5 mi | Creek crossings, water most of the summer |
| Woodland Trail | short, steep | The oldest Ashe junipers on the preserve |
| Yaupon Loop | ~2 mi | Crosses Bee Creek along the southern edge |
A first-time visitor gets funneled to Arroyo Vista and the Overlook and leaves thinking they have seen it. A resident who lives five minutes away can pick a different trail every week of the summer without repeating.
The preserve runs a small calendar of programs that most nearby residents have never used. The one worth building a summer around is the guided hike. The Second Saturday guided hikes run 9 to 11 a.m., with 2026 dates including July 14 and August 14, led by seasoned trail guides and naturalists, and space is limited to fifteen people per hike. The preserve also runs a First Friday Walk and Talk with Center staff, a Speaker and Social Series aimed at adults, and Stewardship Saturdays working alongside the Preserve Manager on trail and restoration projects. Fifteen-person cap and free weekday walk-ins mean the calendar functions less like a public park and more like a small membership organization you happen to already qualify for.
The one loose piece of the summer is the Pennybacker overlook. This is where the Loop 360 rebuild starts to shape what the neighborhood does on a Saturday. Access to the popular overlook is expected to be cut off during some of the upcoming work, with a plan to eventually reopen it, possibly with better parking. The city has already begun to formalize what has been informal for decades. Public parking, a new sidewalk, and trail expansion could be added to the area near the Pennybacker Bridge, with plans to acquire roughly 1.1 acres of property and about 0.36 acres of trail, sidewalk, and recreational easement on land at 5379 West Courtyard Drive appraised at just over $167,000.
For the moment, the overlook is still there and still free. The realistic 2026 posture: use it now, expect it to be inaccessible at some point during the Courtyard/2222 phase, and know that the eventual reopening will look more like a real trailhead and less like the shoulder-parking scramble it has been since the bridge opened in 1982.
A working summer Saturday, using only the neighborhood's own doorstep:
The through-line is that none of it is more than five minutes from the front door, and none of it depends on crossing the Westlake Drive light in a hurry. That was a nice-to-have five years ago. This summer, with the underpasses in their final push and the northbound work ramping up behind them, it is closer to a strategy.
If you are thinking about buying or selling in Davenport Ranch this year, the construction timeline matters to pricing conversations in ways it did not before, and the resident's version of the neighborhood is worth understanding before you list. Liz King works this corridor daily and can walk you through what the corridor rebuild means for your specific block. Schedule a Consultation to talk through it.
Stay up to date on the latest real estate trends.
With Liz, it’s not just about the sale—it’s about the relationship. She takes the time to understand your goals, then works tirelessly to help you achieve them.